The ConsensusDocs' 496 is a design-build change order that can be used with the ConsensusDocs' 415. It provides a contract document to formalize changes in the work that impact the design-build project scheduled time, contract price, or both. The Design-Builder and Owner both sign this mutually acceptable adjustment.
Included in:
Full Package, Design/Builder Package
