Program Management Documents (800 Series)
ConsensusDOCS 800: Program Management Agreement and General Conditions Between Owner and Program Manager
The contractual configuration is of a “pure/agent program manager,” not at risk, either with all design and construction contracts signed by the Owner or the Program Manager signing the contracts as the agent of the Owner. The Program Manager can be seen as replacing the Owner’s facilities staff and may oversee a project delivery accomplished under a variety of methods (e.g., design-bid-build or design-build) for each discrete project or site. This contract provides a scope of services presented in a matrix to be used as a menu for the parties to assign duties.
ConsensusDOCS 801: Construction Management Agreement Between Owner and Construction Manager (Construction Manager is Owner’s Agent and Owner Enters Into All Trade Contractor Agreements)
May be used with the construction management process when the Owner awards all the trade contracts.
ConsensusDOCS 802: Agreement Between Owner and Trade Contractor (Construction Manager is Owner’s Agent)
Describes the legal relationship between the Owner and each Trade Contractor, who becomes prime to the Owner. This document is compatible with the ConsensusDOCS 801.
ConsensusDOCS 803: Agreement Between Owner and Architect/Engineer (Construction Manager Acting as Agent Has Been Retained by Owner)
Developed expressly to coordinate with ConsensusDOCS’ other Construction Management agency forms, specifically ConsensusDOCS 801 and 802.
ConsensusDOCS 810: Agreement Between Owner and Owner’s Representative
Agreement between an Owner and a person/entity acting as an Independent Contractor, who shall serve as the Owner’s authorized representative for a specific project, assuming that the Owner will retain both a Architect-Engineer and a Contractor.
ConsensusDOCS 812: Interim Directed Change
Issued by the Owner to the Trade Contractor in the absence of agreement on price and time for changes in the trade contract work.
ConsensusDOCS 813: Change Order
Used to formalize changes in the trade contract work and make adjustment to time and price.
ConsensusDOCS 814: Certificate of Substantial Completion
Establishes the date of final completion of the work.
ConsensusDOCS 815: Certificate of Final Completion
Establishes the date of final completion of the work.